Record
Setting Expandable Casing Installation
Offshore
Energy Services working for Nexen Petroleum and with Enventure
Global Technology, assisted in the installation of the longest
solid expandable tubular on record - 6,867' - 7 5/8"
29# XPC.
The
record SET system was used in the drilling of the second sidetrack
on Aspen 1 at Green Canyon Block 243. Nexen drilled
the well utilizing the semi GSF Arctic 1.
back
to News main page
|